OK

This website uses cookies to store information on your computer. By using our site you accept My BWMP Terms of Use Learn more

MyBWMP Quote

Please answer the following questions to get an automated quote.

This quote will include fees for the approval of Ballast Water Management Plan (BWMP) in accordance with Regulation D-1 of Ballast Water Management Convention. Please note that:

  • For BV classed ships under the Flag State Administrations of Sweden and New Zealand, the Statement of Compliance* (SoC) or International Ballast Water Management Certificate (IBWMC) shall be issued only:
    • after complete approval of the BWMP, and
    • initial survey (only applicable for ships >= 400GT).
  • For BV classed ships under the Flag State Administration of Singapore, the SoC* or IBWMC shall be issued only:
    • after complete BWMP submission, and
    • initial survey (only applicable for ships >= 400GT).
  • For ships under Liberia or Panama Flag State Administrations, approval of BWMP shall be directly requested to the Flag Authorities.
  • For other Flag State Administrations, the SoC** / IBWMC can be issued administratively at complete BWMP submission.

*For ships <400GT; ** For ships <400GT or for non-ratifying Flags or Flags which have not delegated BV

This quote does not include potential Initial survey.

If you wish to get a quote for a series of sisterships:

  • Discount will be applied
  • Those ships must have the same conditions:
    • Same BWM methods (sequential and / or flow through and / or dilution)
    • Same approved loading indicator types (Regulatory Stability and / or Longitudinal Strength)
    • Same length
    • All ships must be classed with Bureau Veritas (BV)

 

Your ship(s)

Do you request approval of BWM Plans for a single ship or for a series of BV sisterships?
What is the Ballast Water capacity of your ship(s) in m3?

Ship(s) details

Is the Sequential Method used on this / those ship(s)?